Monitoring The Program - Mitsubishi Electric MELSEC iQ-R-R00CPU User Manual

Melsec iq-r series cpu module application user's manual
Table of Contents

Advertisement

27.7

Monitoring the Program

Check the operation of a program on the engineering tool.
Change the connection destination with the engineering tool and check the operating status of the system A or B.
[Online]  [Current Connection Destination]
For how to check the operation, refer to the following.
 GX Works3 Operating Manual
27 PROCEDURE FOR STARTING UP A REDUNDANT SYSTEM
434
27.7 Monitoring the Program
1.
Select a system in "Specify Redundant CPU" on the "Specify
Connection Destination Connection" window.
2.
Click the [Connection Test] button to check whether the CPU
module of the selected system has been connected.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents