Maintenance
Table of Contents
•
"Inspections and checks"
•
"Service Intervals"
•
"Preparing Temperature Calibration"
•
"Temperature Calibration Procedure"
•
"Preparing the CO2 calibration"
•
"CO2 calibration procedure"
•
"Replacing the HEPA-filter"
•
"Replacing the gas inlet filter"
•
"Device fusing replacement"
•
"Replacing the Door Seal"
Inspections and checks
To ensure the operational performance and safety of the device, their functions and the components
listed below must be checked at regular intervals.
Daily check:
• Gas reserve of the CO
• Gas reserve of the O
Annual inspection:
• Tightness of the glass door seal.
• Permeability of the pressure compensation opening with insert.
• Perform functional check of the control panel and of the incubator's built-in controller.
• Electrical safety check in accordance with the relevant national regulations (e.g. BGV 3).
Note Functional check:
If safety devices were removed or disabled for inspections, the device must not be operated before
the safety devices have been reinstalled and checked for their correct function.
Thermo Scientific
on
page 9-1
on
page 9-2
on
page 9-2
on
page 9-3
on
page 9-5
on
page 9-6
on
page 9-7
on
page 9-9
on
page 9-10
on
page 9-11
supply system.
2
-/N
supply system.
2
2
9
i160 / i250
S
TERI-CYCLE
9-1