Operation
Table of Contents
•
"Preparing the device"
•
"Starting operation"
Preparing the device
The device must not be released for operation before all major start-up activities (see
page
4-1) have been completed.
Device check:
Prior to starting operation, the following device components must be checked for their correct function
• Gas hoses must be seated tight on the connecting filter and must be secured using a hose clamp.
• The access port must be capped.
• The pressure compensation opening must be permeable, its insert must be installed in the
workspace.
• The glass door seal must not be damaged.
• The glass door/gas-tight screen measurement opening must be capped.
• The shelf system components must be installed safely.
• The airbox with the HEPA-filter and the air duct must be installed according to the instructions.
Decontaminating the device workspace:
• Run the steri-run decontamination routine (see
or decontaminate the workspace according to the hygiene regulations set forth by the operator.
Thermo Scientific
on
page 5-1
on
page 5-3
"Steri-run decontamination routine"
5
"Start-up"
on
on
page
i160 / i250
S
TERI-CYCLE
8-7)
5-1