Operator Maintenance; Replacing The Power Line Fuse - Keysight N1911A User Manual

P-series power meters
Hide thumbs Also See for N1911A:
Table of Contents

Advertisement

Operator Maintenance

This section describes how to replace the power line fuse and clean the power
meter. If you need additional information about replacing parts or repairing the
power meter, refer to the P-Series Power Meter Service Guide.
To clean the power meter, disconnect its supply power and wipe with a damp
cloth only.
The power line fuse is located within the power meter's fuse holder assembly on
the rear panel. For all voltages the power meter uses a 250 V, F3.15 AH, 20 mm
fast blow fuse with high breaking capacity (Keysight part number 2110-0957).
The power meter also has an internal fuse. If you suspect that this fuse needs to
NOTE
be replaced, it must be done by trained service personnel. Please refer to
"Returning Your Power Meter for Service"

Replacing the power line fuse

1 Slide the fuse holder assembly from the rear panel as shown in
2 Install the correct fuse in the "In line" position as shown in
3 Replace the fuse holder assembly in the rear panel.
Keysight N1911A/1912A User's Guide
spare fuse can be stored in the fuse holder assembly.)
Maintenance
on page 281.
Figure
10
Figure
10-3.
10-3. (A
275