Preparation for commissioning

Before commissioning observe the conditions described in this chapter.
● The preconditions for commissioning must be fulfilled (in the next chapter).
● The relevant checklist must have been worked through.
● The bus components required for communication must be wired up.
● DRIVE-CLiQ wiring rules must be complied with.
● The ON-OFF responses of the drive.
STARTER Commissioning Manual
Commissioning Manual, (IH1), 07/2016, 6SL3097-4AF00-0BP5