Commissioning the vector control chassis format for the first time

An example provided in this chapter explains all the configuration and parameter settings, as
well as tests that are required for initial commissioning. Commissioning is carried out using
the STARTER commissioning tool.
Preconditions for commissioning
● The commissioning preconditions (Page 30) have been met.
● The commissioning checklists (Page 32) (Tables 2-1 and 2-2) have been completed and
the points fulfilled.
● The STARTER commissioning tool is installed and activated.
– System prerequisites, refer to the Readme file in the STARTER installation directory.
● The drive system has been wired according to the specifications.
● The communication between the PG/PC and drive system has been prepared.
● The power supply of the Control Unit (24 V DC) has been switched on.
STARTER Commissioning Manual
Commissioning Manual, (IH1), 07/2016, 6SL3097-4AF00-0BP5
3.7 Commissioning the vector control chassis format for the first time
Commissioning
143

Advertisement

Table of Contents
loading

Table of Contents