Epson RC620 Safety And Installation page 198

G / rs / c3 / s5 / x5 series, robot controller
Hide thumbs Also See for RC620:
Table of Contents

Advertisement

3. First Step
4. Run the program
(1) Press F5 to run the program. (F5 is the hot key for the Run Window
(2) During project build, your program is compiled and linked.
(3) Click the Start button on the Run window to run the program.
(4) You should see text similar to the following displayed in the Status
On the Run window, you will see the output of the print statement.
184
selection of the Run menu). You will see the Status window located at
the bottom of the main window showing the build operation status.
communications is established with the controller and project files are
sent to the controller. If there are no errors during build, the Run
window will appear.
window:
19:32:45 Task main started
19:32:45 All tasks stopped
Safety and Installation (RC620 / EPSON RC+ 6.0) Rev.12
Then

Advertisement

Table of Contents
loading

This manual is also suitable for:

G seriesRs seriesC3 seriesS seriesX5

Table of Contents