because of potential space limitations at some data centers. Also, you run the risk
of not placing the Controllers in the correct rack position and causing possible
cabling issues.
Note: Controller rails are packaged within the Pilot shipping carton (not the
Controller shipping carton). Ensure that the Controller rails are not misplaced
during unpacking.
Controller Rail Kits
The Controller rail kit contains the following items:
One slide rail that attaches to the rack posts
•
One mounting bracket that attaches to the Controller chassis
•
CMA with six pre-installed cable clips
•
Package of mounting screws and nuts in assorted sizes to fit various types
•
of racks and cabinets
Manufacturer's instruction sheet for the CMA
•
The following table summarizes the mounting hardware packaged with the
Controller rail kits.
Table 21: Controller rail kit mounting screws
Contents of the mounting screw packet Quantity
10-32 pan head screw
8-32 pan head screw
Metric M6 pan head screw
6–32 flat head screw
8
4
8
2
Install Component Rails
Usage
Assemble main and
extender sections of
left and right rails
(Typically, left and
right rails are shipped
pre-assembled)
Mount left and right
rails to front of
cabinet rails
Mount left
•
and right rails
to back of
cabinet rails
Secure front
•
of chassis to
left and right
cabinet rails
Secure back of chassis
to left and right side
rails
47