The labels that are applied to cables during the manufacturing process can
help facilitate the process of cabling by providing you the details that
define each cable attachment.
5
Remove the system record and other instructional documents from the
cartons and keep them aside for reference.
6
Attach the World Wide Node Number (WWnN) label and the system serial
number (SSN) label at the designated locations.
Related Links
Unpacking Systems
System Components
Required Tools
Before starting the installation of an Oracle Flash Storage System, be sure you
have the required equipment and tools available.
Table 15: Required tools
Tool
Number 1 and Number 2
Phillips-head screwdrivers
Offset box wrench, 13/32
inches
Torx
T20 screwdriver
®
Torx
T30 screwdriver
®
Wire cutters
Warnings and Cautions
Hazard signal words conform to the American National Standards Institute
(ANSI) Z535.4-2002 meanings.
Caution: Indicates a potentially hazardous situation that, if not avoided, may
result in minor or moderate injury.
Danger: Indicates an imminently hazardous situation that, if not avoided, will
result in death or serious injury.
Tip: To indicate best practices for a process.
Important: To emphasize a point, to remind you of something, or to indicate
potential problems in the outcome of the in-process task.
Oracle FS Systems: Installation Overview
Purpose
Remove and secure Oracle
Flash Storage System
hardware components.
Work with adjustable
mounting rail assemblies.
Attach rail assemblies and
secure hardware
components to the rails.
Connect two racks.
Cut cable wraps on the
power cords.
Illustration
34
Need help?
Do you have a question about the FS1-2 and is the answer not in the manual?
Questions and answers