Caution: Do not turn on any power circuits until the installation of all ordered
hardware is complete and all internal cables are in place. Turning on the power
to the system prematurely can prevent the system from starting up correctly.
Note: Each circuit has its own amperage limits. Plug in the system components
so that no PDU amperage limits are exceeded.
Tip: Review the information on Oracle FS System power requirements in this
guide.
Related Links
Not-Racked Systems
Unpacking Systems
Planning for a System Installation
System Components
Site Preparation Checklist (Not-racked Systems)
Planning for a System Installation
Following items are a part of the planning and site preparation before the
installation of an Oracle FS System:
System weight
•
Physical dimensions
•
Power requirements
•
Rack specifications
•
Hardware specifications
•
Unpacking requirements
•
Note: To ensure that all planning requirements have been met and the site is
ready for a not racked Oracle FS System installation, follow the site preparation
checklist.
Related Links
Component Chassis Hardware Specifications
System Power Requirements
PDU Hardware Specifications
Required Tools
Warnings and Cautions
Electrostatic Discharge Precautions
Site Preparation Checklist (Not-racked Systems)
System Components
Oracle FS Systems: Installation Overview
18