MAINTENANCE MANUAL > Disassembly and Reassembly > Pressurizing relations > Pressure switch assy.
Model
SWJ-320S
Issued 2012.07.19 Revised
6.6.4 Pressure switch assy.
Pressure switch assy.
After turning off the sub and main power switches, unplug the power cord. Make sure to take 15
minutes before restarting the operation. It is very dangerous if sleep mode functions mistakenly
during the operation.
Additionally, if electric charges are still remaining, it may cause damage to electronic parts or the like.
Work procedures
4
3
2
Air tank sensor assy.
The bracket back
Relay connectors (6 positions)
screw(x4)
© 2013 MIMAKI ENGINEERING CO.,LTD.
1. Turn off the main power supply and remove the power plug
from the main body.
Bracket
2. Open the cover LR.
3. Remove the screw, and remove the BKT.
screw(x2)
1
4. Disconnect the relay connectors of pressure switch assy. on the
bracket back.
5. Remove the following covers.
キ
• CoverST-L
6. Remove the screw, and remove the pressure switch assy..
7. Reverse the disassembly procedure for reassembly.
F/W ver
Remark
Rev.
1.0
1
2
3
4
5
6
7
8
6.6.4
R.1.0
P.1