Ni-1 Bri Provisioning Test - Avaya MERLIN MAGIX Maintenance And Troubleshooting Manual

Integrated system release 2.0 and earlier
Hide thumbs Also See for MERLIN MAGIX:
Table of Contents

Advertisement

NI-1 BRI Provisioning Test

This test verifies that each communication path on the 800 NI-BRI module is operational by
establishing and disconnecting a series of voice and data calls between any two communication
paths on the module.
The NI-BRI Provisioning Test includes testing for BRI facilities that are part of Multiline Hunt
Groups (MLHGs). Prior to testing, the BRI facility must have a MLHG group number programmed.
The number (up to 10 digits) is appended to the end of the Directory Number (DN) (separated by a
# character) programmed for the BRI line.
Before proceeding with this test, obtain completed copies of System Planning Form 3-i, Incoming
Trunks: BRI Options and the NI-1 BRI Planner Form.
If an 800 NI-BRI module has only one DN/SPID provisioned on it, the provisioning test
cannot be run on that module. To test the line, move one DSL from another 800 NI-BRI
module to this module. The DSL that is moved should have been tested successfully and,
to make testing easier, should not be part of a MLHG. This move involves administering a
line on the DSL and connecting the cable on the target module. Run the test on the two
DNs. When the test is successfully completed, remove the programming from the board
just tested so that the single line is left on the board. Then reconnect the cable to the
original slot and port.
All 800 NI-BRI modules must be busied out and those BRI boards not being tested must be
unplugged from the carrier before testing can begin.
Procedure
Busy-Out or Reset
Appropriate Modules This test can be run only on 800 NI-BRI modules.
Time Estimate
LEDs
Interrupting the Test Interrupt the test by selecting
Test Failure
Restore
Menu
Maintenance
Provisioning
Busy-out or reset the module being tested prior to beginning the test. See
''Busy-Out''
on page
6-4
Approximately 20 minutes for a fully utilized board. However, communication
paths with errors increase the time. Boards with fewer programmed lines and
no errors decrease the time.
While the test is running, the LEDs are in the following states:
Green — blinks to indicate the test is running
I
Yellow — flashes on and off while calls are being established and
I
disconnected
Red — stays on until Layers 1—3 are initialized for all programmed
I
communication paths on the module
If the test fails, see NI-1 BRI Provisioning Test Errors and NI-1 BRI
Provisioning Test Result Codes. If the module must be replaced, record the
errors on the repair tag and replace the module.
Restore the module if it successfully completes all module tests and the
errors no longer occur. See
6
Enter the BRI slot no. (01-17)
Slot
and
''Reset''
on page 6-5.
.
Back
''Restore''
on page 6-6.
Tests
Enter

NI-1 BRI Provisioning Test

6-13

Advertisement

Table of Contents
loading

Table of Contents