Engine Asssembly (16 Valve) Removal And Installation; Engine Assembly - Mitsubishi 1989-1993 GALANT Service Manual

Table of Contents

Advertisement

ENGINE ASSEMBLY <I6 VALVE>
REMOVAL AND INSTALLATION
Pre-removal
Operation
@Eliminating Fuel Pressure in Fuel Line (Refer
to GROUP 13-Service Adjustment Proce-
dures.)
Removal of the Hood
l
(Refer to GROUP 42-Hood.)
Draining of the Engine Coolant
l
(Refer to GROUP 00-Maintenance Service)
Removal of the Transaxle
l
(Refer to GROUP 22,23-Transaxle.)
Removal of the Radiator
l
(Refer to GROUP 14-Radiator.)
Fuel rail
6
Engine oil
Removal steps
2. Brake booster vacuum hose connection
3. Heater hose connection (cylinder head -
heater unit)
4. Heater hose connection (Heater unit +
water inlet pipe)
hose connection
5. Fuel high pressure
6.
O-ring
7. Fuel return hose connection
8. Accelerator cable connection
9. Engine coolant temperature gauge unit
connector
<SOHC>
ENGINE

-- Engine Assembly

connector
12. Distributor connector
13. Condenser connector
14. TPS connector
15. IAC connector
16. Injector connector
17. Air conditioning compressor connector
18. Control harness
Post-installation
Operation
Installation of the Radiator
l
(Refer to GROUP 14-Radiator.)
Installation of the Transaxle
l
(Refer to GROUP 22, 23-Transaxle.)
Refilling of the Engine Coolant
l
(Refer to GROUP 00-Maintenance Service.)
Installation of the Hood
l
(Refer to GROUP 42-Hood.)
4 - 6 Nm
I

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents