Isuzu 1999 RODEO Workshop Manual page 1437

Rodeo 1999
Hide thumbs Also See for 1999 RODEO:
Table of Contents

Advertisement

6E2–194
RODEO 6VD1 3.2L ENGINE DRIVEABILITY AND EMISSIONS
DTC P0152 – HO2S Circuit High Voltage Bank 2 Sensor 1 (Cont'd)
Step
5
Repair short to voltage in signal circuit.
Is the action complete?
6
1. Ignition "ON," engine"OFF."
2. At Bank 2 HO2S 1 connector (PCM side) jumper
both the HO2S high and low signal circuits (PCM
side) to ground.
3. Using a Tech 2, monitor Bank 2 HO2S 1 voltage.
Is Bank 2 HO2S 1 voltage below the specified value?
7
1. Disconnect the jumpers to ground from Bank 2
HO2S 1 PCM-side connector.
2. With the HO2S 1 connector disconnected, monitor
Bank 2 HO2S 1 voltage.
Is the Bank 2 HO2S 1 voltage between the specified
values?
8
Replace the PCM.
IMPORTANT: The
programmed.
Powertrain
Control
procedures.
And also refer to latest service bulletin.
Check to see if the Latest software is released or not.
And then Down Load the LATEST PROGRAMMED
SOFTWARE to the replacement PCM.
Is the action complete?
Action
replacement
PCM
Refer to On-Vehicle Service in
Module
and
Sensors
Value(s)
10 mV
425-475 mV
must
be
for
Yes
No
Verify repair
Go to Step 7
Go to Step 8
Refer to
Diagnostic
Aids
Go to Step 8
Verify repair

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents