Isuzu 1999 RODEO Workshop Manual page 1145

Rodeo 1999
Hide thumbs Also See for 1999 RODEO:
Table of Contents

Advertisement

6A–60
ENGINE MECHANICAL (6VD1 3.2L)
3. Install valve to valve guide. Before install valve guide
apply engine oil to the outside of the valve stem.
4. Install valve spring to cylinder head. Attach the valve
spring to the lower spring seat. The painted area of
the valve spring should be facing downward.
5. Install lower valve spring seat, valve spring and upper
valve spring seat then put split collars on the upper
spring seat, using the J–8062 valve spring compresor
and J–42898 valve spring compressor adapter to
install the split collars.
6. Install tappet with shim.
7. Install camshaft assembly.
f Refer to installation procedure for Camshaft in this
manual.
Valve Clearance Adjustments
NOTE: To adjust valve clearance, apply engine oil to the
cam as well as to the adjusting shim (2) with the cylinder
head built on the cylinder block, give a few turns to the
camshaft by means of timing pulley tightening bolt, and
measure valve clearance when the nose of cam is just
opposite to maximum cam lift (1) as shown in illustration
below.
014RS020
Legend
(1) Cam
(2) Shim
(3) Tappet
Valve Clearance Standard Value (cold)
Intake: 0.23 mm–0.33 mm
(0.0091 in–0.0130 in)
Exhaust: 0.25 mm–0.35 mm
(0.0098 in–0.0138 in)
014RW042
014RW081

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents