Release 9si/10si/Communication Manager 1.x to Communication Manager 2.1
Task list: R9si/10si/Communication Manager 1.x to Communication Manager 2.1
Check SPE
Return to Task List
1
Type
status system 1
Check these fields for the corresponding values:
— Maj/Min alarms = 0
— Service State = in service
Return to Task List
Verify the software version
Return to Task List
1
Type
list configuration software-version
The Software Versions screen appears.
2
In the UPDATE FILE section, check the Update State field for a software patch:
— If there is a patch number, then a patch has been applied.
— If the field is none in memory, there is no software patch in system memory.
If you need to restore the system to the old software version, you must also download a patch onto
the system.
3
In the SOFTWARE VERSION section note the current software version listed in the Memory
Resident field.
Ensure that the current software version is compatible with this software-only upgrade path.
Return to Task List
Verify system status
Return to Task List
1
Type
status system 1
Check these fields for the corresponding values:
— In the SPE ALARMS section, MAJOR and MINOR alarms = 0
— Service State = in service
2
If there are alarms, take the necessary corrective actions (
3
Type
display errors
4
Examine the Hardware Error Log and record any Error Code 18 alarm that identifies existing
busyouts. After the upgrade you will restore the busyouts as they were
5
For configurations with existing BX.25 links that are being retained after the upgrade, type
display communication-interface links
46
and press Return.
and press Return.
and press Return.
and press Return.
and press Return.
).
display alarms
(Restore
busyouts).
SI Installation and Upgrades
June 2004