Install And Connect Scc1; (Single-Carrier Cabinets); Task List: Install And Connect Single-Carrier Cabinets (Scc1) - Avaya MCC1 Installation And Upgrades

Media gateways installation and avaya definity server si upgrades made easy
Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

Install and Connect SCC1

(Single-Carrier Cabinets)

This section describes how to install the Single-Carrier Cabinets (SCC1). For information on Multicarrier
Cabinets (MCC1), go to
Floor plans and equipment layouts for typical system installations are provided in Hardware Guide for
Avaya Communication Manager (555-245-207).
For duplicated systems only:
on page 193 includes instructions for installing the fiber optic cable between the duplication interface
circuit packs in cabinets A and B.
Task List: Install and Connect Single-Carrier Cabinets
(SCC1)
Perform these tasks before you begin the installation:
1
Check Customer's Order
2
Unpack and Inspect Cabinets
3
If you cannot get timing from the service provider, you may need to install a Stratum 3 clock. If
this system includes a Stratum 3 clock, go to
instructions.
4
Check Circuit Packs
5
Correct Shipping Errors
Perform these steps to install the cabinets:
6
Position the Cabinets (Standard Reliability)
Reliability)
7
If required,
CAUTION:
System grounding must comply with the general rules for grounding contained in Article
250 of the National Electrical Code (NEC), National Fire Protection Agency (NFPA) 70,
or the applicable electric code in the country containing the equipment.
8
Ground DC-Powered Cabinets
Powered Cabinets
9
If the cabinet stack contains more than one Single-Carrier Cabinet,
Multiplexing Bus Cables
10
Verify Port Cabinet Address Plugs
11
Install Rear Panels
SI Installation and Upgrades
June 2004

Task List: Install and Connect Single-Carrier Cabinets (SCC1)

Install and Connect MCC1 (Multicarrier) Cabinet
Install Fiber Optic Cable Pass-Thru Kit for SCC1 (Single-Carrier) Cabinets
on page 364
on page 364
on page 364
on page 365
on page 366
Install Earthquake Protection for SCC1
and
Connect DC Power
on page 382
on page 385
on page 390
on page 391
Install and Connect SCC1 (Single-Carrier Cabinets)
on page 327.
Installing the Stratum 3 Clock
on page 365 or
Position Cabinets (High or Critical
on page 367
on page 374 or
Connect Time Division
on page 693 for
Ground and Connect AC-
363

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1

Table of Contents