Replacing The Cabinet And Control Carrier; Power Requirements - Avaya MCC1 Installation And Upgrades

Media gateways installation and avaya definity server si upgrades made easy
Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

If the control carrier in the small-cabinet System 75 system contains a TN752 or TN755B power
supply, this circuit pack will occupy port slots 12 and 13 of the new R7si enhanced control carrier.
If you simultaneously add an EPN, you must install a TN776 or TN570D expansion interface
circuit pack in slot 1 of the new R7si or R8si enhanced control carrier.
If you have both of the above scenarios, the result is either a net loss of 2 port slots (from the AB
carrier) or a net gain of only 2 port slots (from the AA carrier).

Replacing the cabinet and control carrier

When you replace the cabinet and control carrier for a small-cabinet System 75:
You need to move and manually retranslate port circuit packs from the small-cabinet System 75
control carrier.
A new R7si/R8si control carrier with 9 port slots and new power supplies will replace either:
— An R1V3 J58890AB control carrier in a Model 1 with 12 port slots. This provides 3 fewer
port slots.
— An R1V3 J58890AA control carrier in a Model 2 with 8 port slots. This provides 1 extra
port slot.
Out of these 9 port slots, nonport-related circuit packs may need to occupy certain slots.
If the control carrier in the small-cabinet System 75 system holds a TN752 or TN755B power
supply, this circuit pack will occupy port slots 8 and 9 of the new R7si/R8si control carrier.
If you simultaneously add an EPN, you must install a TN776 or TN570D expansion interface
circuit pack in slot 1 of the new R7si/R8si control carrier.
If you have both of the above scenarios, the result is either a net loss of 6 port slots (from the AB
carrier) or a net loss of 2 port slots (from the AA carrier).

Power requirements

See the power and grounding requirements in DEFINITY Communications System Generic 1 and
Generic 3 Installation and Test (555-230-104).
SI Installation and Upgrades
June 2004
System 75 Small-Cabinet to R8si (Blowback)
Task List: System 75 Small Cabinet to R8si
323

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1

Table of Contents