Install Telecommunications Cabling

Main Distribution Frame

Main Distribution Frame
The preferred location of the Main Distribution Frame (MDF) is directly behind the Single-Carrier
Cabinet (SCC1) stack or the Multi-Carrier Cabinet MCC1).
Blocks (SCC1),
terminal blocks, and
typical Multi-Carrier Cabinet installation using 900-pair 110P-type terminal blocks.
Figure 137: Typical 110A-Type Terminal Blocks (SCC1)
Figure notes
1
Single-Carrier Cabinets (Stacked)
(SCC1)
2
Z113A Cable Slack Manager
3
25-Pair Cable to System Cabinet
408
on page 408 shows a typical SCC1 (Single-Carrier Cabinet) installation using 110A-type
Figure 138, Typical 110P-Type Terminal Blocks (MCC1),
Figure 137, Typical 110A-Type Terminal
4
Station Cables
5
Station Distribution Field
6
Port Distribution Field
7
Trunk/Auxiliary Field
SI Installation and Upgrades
on page 409 shows a