Power Down Ppn [From G3V4] - Avaya MCC1 Installation And Upgrades

Media gateways installation and avaya definity server si upgrades made easy
Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

G3iV4 to Avaya Communication Manager
Task List: G3iV4 to Avaya Communication Manager
2
Type
reset system shutdown
3
Press Enter again to start the shutdown.
The
SHUTDOWN Completed
takes about 2 minutes.
CAUTION:
If leaving AUDIX System in the carrier, back it out about 2 in. (5 cm) to eliminate the
possibility of damage due to power surges.
Return to Task List

Power down PPN [from G3V4]

Return to Task List
CAUTION:
Important system data such as BCMS data, records of queued ACD calls, Automatic
Wakeup requests, and Do Not Disturb requests will be lost on power down. You cannot
store to or retrieve data from tape or flash.
CAUTION:
On a DC-powered SCC, do not power down by reseating the power supply as it will trip
the breakers on the DC power cabinet.
NOTE:
The breaker on an MCC is on the bottom front of the cabinet; the breaker on an SCC is on
the back of the cabinet.
1
At the PPN power-distribution unit, set the main circuit breaker to OFF.
2
If the site has a power-failure transfer panel, connect a ground strap to the panel and to a ground
source. Verify that the power-failure stations are working.
Remember to disconnect this strap before reapplying power.
Return to Task List
80
and press Enter.
message displays when the AUDIX is successfully shutdown. This
SI Installation and Upgrades
June 2004