Task List: System 75 XE to R8si

Use this task list to upgrade a System 75 XE to R8si. Steps are provided for
Single cabinets (PPN)
Dual cabinets (EPN)
Earthquake protection
Ensure that these tasks are complete before the upgrade visit:
1
Verify the required hardware [75 XE upgrade]
2
Provide the required tools [75 XE upgrade]
Perform these tasks during the upgrade visit:
3
Unpack and inspect control cabinet for damage [75 XE upgrade]
4
Verify software load [75 XE upgrade]
5
Verify system status [75 XE upgrade]
6
Disable scheduled maintenance and alarm origination [75 XE upgrade]
7
Save translations to tape [75 XE upgrade]
8
Verify power and grounding and check for power transfer stations [75 XE upgrade]
9
Modify external alarm connections [75 XE upgrade]
10
Label cables [75 XE upgrade]
11
For systems so equipped:
12
Power down PPN [75 XE upgrade]
13
Disconnect power and grounding and SAT terminal [75 XE upgrade]
14
Verify power failure stations (if present) [75 XE upgrade]
15
Remove door and panels [75 XE upgrade]
16
Remove circuit packs from the carrier [75 XE upgrade]
17
Disconnect TDM cables [75 XE upgrade]
18
Remove the control cabinet [75 XE upgrade]
19
Install new control cabinet [75 XE upgrade]
protection [75 XE upgrade]
20
Install enhanced control cabinet (duplicated system) [75 XE upgrade]
21
Install port cabinets [75 XE upgrade]
22
Install circuit packs into the port cabinets [75 XE upgrade]
reinstall the TN756.)
23
Change cabinet address plugs [75 XE upgrade]
24
Move 25-pair cables from System 75 to R8si [75 XE upgrade]
25
Install TDM/LAN bus terminators [75 XE upgrade]
26
Connect TDM/LAN cables and ICC cables for PPN Upgrade [75 XE upgrade]
27
Connect TDM/LAN Cables and ICC Cables for EPN Upgrade [75 XE upgrade]
SI Installation and Upgrades
June 2004
Record any customer-placed busy-outs.
Shut down DEFINITY AUDIX system [75 XE upgrade]
(EPN only)
or
Install new control cabinet with earthquake
(PPN upgrade only)
System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
(If a TN2182 is installed, do not
227