Installation For Mcc1; (Multicarrier Cabinets) Made Easy - Avaya MCC1 Installation And Upgrades

Media gateways installation and avaya definity server si upgrades made easy
Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

Installation for MCC1

(Multicarrier Cabinets) Made Easy

Perform these tasks to install multicarrier cabinets:
1
Install and Connect MCC1 (Multicarrier) Cabinet
2
Install Telecommunications Cabling
3
Bring the System Online
4
Test the System
5
Install and Wire Telephones
6
Install and Administer Trunks
7
Install and Wire Telephone Power Supply
8
Install Additional Hardware
9
Add IP Solutions
10
Install and Connect Modems
11
Administer the features, telephones, and other equipment according to customer data found on the
provisioning plan. Use the procedures in the Administrator's Guide for Avaya Communication
Manager (555-233-506).
12
Test Telephones and Other Equipment
Select the activity you are currently performing to see information, task lists, and procedures for that
activity.
NOTE:
It may be more efficient to install each hardware component, administer it, and test it
before going on to install another component. As an example, install the attendant console
using the procedures in
the Administrator's Guide for Avaya Communication Manager (555-233-506), and test it
using the procedures in
You can also find information on these topics here:
Option Switch Settings
Approved Grounds
Administering Fiber Optic Cables
Connector and Cable Diagrams (Pinout Charts)
SI Installation and Upgrades
June 2004
Installation for MCC1 (Multicarrier Cabinets) Made Easy
Install and Wire
Telephones, administer it using the procedures in
Test Telephones and Other
Equipment.
325

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1

Table of Contents