Sneak Fuse Panels; Cable Installation - Avaya MCC1 Installation And Upgrades

Media gateways installation and avaya definity server si upgrades made easy
Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

Sneak Fuse Panels

Sneak current protection is required between the incoming RJ21X or RJ2GX network interface and the
system for both trunk and off-premise circuit packs.
The Model 507B sneak current fuse panel, or equivalent, is recommended for sneak current protection.
The panel contains two 25-pair connectors, fuse removal tool, and fifty 220029 sneak fuses (and two
spares).
Connector cables (B25A male to female) connect the network interface to the sneak fuse panel. Also,
157B connecting blocks equipped with SCP-110 protectors can be used for sneak current protection.
NOTE:
Sneak current protectors with a rating of 350 mA at 600 volts must be Underwriter's
Laboratory (UL) listed for domestic (USA) installation and Canadian Standards
Association (CSA) certified for Canadian installation.
The 507B includes 52 sneak fuses and two cables.
The SCP-110 protectors are used with 110-type hardware and on the 507B Sneak Fuse Panel. The
SCP-110 Protectors can be ordered separately and installed on the 157B connecting block. Fifty
protectors are required per block.

Cable Installation

NOTE:
To route the cables from the rear of the SCC1 stack or MCC1 to the MDF, use the
Cable Slack Managers
416.
This section has information about
Equipment Room Cabling Labels
Cable Routing Guidelines
Control Carrier Outputs Cable Installation
Connect Control Carrier Outputs Cable
Trunk Cables Among Network Interface, Sneak Fuse Panel, and Cabinet
And procedures for:
Label Control Carrier Cable
Connect Control Carrier Outputs Cable
Connect Trunk Pairs Using Concentrator Cables
Connect Trunk Pairs to Cabinet Using Jumper Wires To Establish 3-Pair Modularity
Install Cables Between Cabinet and MDF
Install Connector Cables Between Auxiliary Cabinet and MDF
SI Installation and Upgrades
June 2004
on page 441 procedure. Also see
on page 412
on page 412
on page 413
on page 432
on page 431
on page 432
on page 432
on page 435
Install Telecommunications Cabling
Sneak Fuse Panels
Cable Slack Manager
on page
on page 413
on page 433
on page 436
Install
411

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1

Table of Contents