Label And Connect Cables [From G3V4Vs/R5Vs/R6Vs] - Avaya MCC1 Installation And Upgrades

Media gateways installation and avaya definity server si upgrades made easy
Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

Figure 4: Cabinet earthquake mounting
STIFFENER
CABINET FOOT
NOTE:
FLOOR
NOTE: BOLT DOES NOT RUN THROUGH CABINET FOOT
Return to Task List
Label and connect cables [from
G3V4vs/R5vs/R6vs]
Return to Task List
1
To make reconnecting the cables simpler and more reliable, label every reusable connector cable
in the system.
2
Install new connector cables, as needed, onto the connectors at the rear of the cabinet.
3
Route the cables to the MDF and cross-connect as needed.
Return to Task List
SI Installation and Upgrades
June 2004
G3V4vs/R5vs/R6vs to Avaya Communication Manager
Task List: DEFINITY vs to Avaya Communication Manager
CABINET
NYLON
3/8-16 X 3.25 INCH
INSULATING
HEX BOLT
WASHER
(2 REQ'D)
(2 REQ'D)
CONCRETE ANCHOR
(2 REQ'D)
SIDE VIEW
concrete floor
149

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1

Table of Contents