Remove Ground Connections [From G3V4Vs/R5Vs/R6Vs]; Move 25-Pair Cables From G3V4Vs System From G3V4Vs/R5Vs/R6Vs; Move Management Terminal Cable From G3V4Vs/R5Vs/R6Vs - Avaya MCC1 Installation And Upgrades

Media gateways installation and avaya definity server si upgrades made easy
Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

Remove ground connections [from
G3V4vs/R5vs/R6vs]
Return to Task List
1
Remove the 6 AWG (#40) (16-mm
system.
This wire later attaches to the new control cabinet.
2
Remove the 10 AWG (#25) (6-mm
block on the rear of the G3vs system.
This wire later attaches to the new control cabinet.
Return to Task List
Move 25-pair cables from G3V4vs System from
G3V4vs/R5vs/R6vs
Return to Task List
1
Remove any reusable 25-pair cables from the rear of the old system.
For G3vs upgrades
replace these cables with new, longer cables.
2
Attach any reusable 25-pair cables to the needed connectors on the rear of the si cabinet.
3
Attach any new 25-pair cables to the needed connectors on the rear of the si cabinet.
4
Route the new cables to the MDF and attach.
Return to Task List
Move management terminal cable from
G3V4vs/R5vs/R6vs
Return to Task List
1
Remove the management terminal cable from the rear of the G3vs.
2
Attach the management terminal cable to the rear of the si system.
Return to Task List
SI Installation and Upgrades
June 2004
G3V4vs/R5vs/R6vs to Avaya Communication Manager
Task List: DEFINITY vs to Avaya Communication Manager
2
) ground wire from the ground block on the rear of the G3vs
2
) coupled bonding conductor (CBC) wire from the ground
Cables connecting the wall-mount G3vs and the si cabinet may be too short. If so,
157

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1

Table of Contents