Chapter 2: Before you install
Read this chapter carefully before you begin the installation. If you are installing the G250 at a
customer site, read this chapter before going to the customer site.
This chapter includes:
Before going to the site
●
Prepare required equipment
●
Site requirements
●
Unpacking
●
Before going to the site
Before going to the site, work through the following sections to prepare required information and
equipment.
Read the planning documentation
Before you begin the installation, read the planning documentation.
The planning documentation provides you with information about:
What media modules you will be installing. Take note of whether or not you are installing
●
an S8300B Media Server module. The installation process is different depending on
whether or not you are installing an S8300B.
Which voice devices and data devices need to be connected to the G250.
●
Whom to contact on site about delivery, system questions, or network concerns.
●
Whom to contact at your home office in case of questions.
●
Whether you need a special pass or an escort.
●
How to gain entrance to the installation location if it is locked.
●
Where to install equipment.
●
Where to find a telephone near the installation location.
●
on page 19
on page 20
on page 24
on page 26
Issue 1.1 June 2005
19