Brocade Communications Systems Brocade 8/12c Command Reference Manual page 350

Brocade fabric os command reference manual supporting fabric os v7.0.0 (april 2011)
Hide thumbs Also See for Brocade 8/12c:
Table of Contents

Advertisement

22
fcrPathTest
DIAG-TIMEOUT
DIAG-XMIT
EXAMPLES
To test slot 2 with FC Router FPGA Serdes loopback sending 10frames:
SEE ALSO
fcrChipTest,
316
The port failed to receive back a frame that was sent out. This can be caused by a
faulty SFP or indicate deeper problems in the main board or ASIC. Check for a
faulty SFP. Replace the SFP if necessary.
The specified port failed to transmit frames. This usually indicates an ASIC failure.
Replace the blade or the switch.
switch:admin> fcrpathtest --slot 2 -path 2 -nframes 10
Running fcrpathtest ..............
Test Complete: fcrpathtest Pass 10 of 10
Duration 0 hr, 0 min & 18 sec (0:0:18:942).
passed.
portLoopbackTest
Fabric OS Command Reference
53-1001764-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fabric os v7.0.0

Table of Contents