INSTALLATION OF MAIN EQUIPMENT

Floor Standing Installation

START
CHECKUP
BEFORE INSTALLATION
MARKING
LEVELING
DRILLING
DETACHING FRONT
COVER
A
2
NEAX2000 IVS
Installation Procedure Manual
ND-70928 (E), Issue 3.0
• Check the site for installing the PBX with the work drawing to verify that
the required floor space is ensured and that service entrances and
ducts for trunk/extension cables, power cables and bus cables have
been properly worked at correct positions. See
2-8.
• Mark positions for installation of the PBX main equipment.
For Fixed Equipment, detach the BASE PLATE from the BASE. See
Figure
2-9.
For Stationary Equipment, see
NOTE:
Measure the level of the floor surface before installing the PBX
main equipment.
• Check the level of the floor. If necessary, adjust the level by inserting
spacers beneath the equipment.
• First open necessary number of preliminary prepared holes using the
drill bit for small-diameter holes, then use the finishing drill bit for
finishing drill holes. See "Drilling".
• Detach the front cover of each PIM. See
CHAPTER 2 INSTALLATION
Installation of Main Equipment
Figure 2-7
Figure
2-10.
"Detaching FRONT
and
Figure
COVER".
Page 63