Floor-standing Installation Equipment
Floor-standing Installation Equipment
Table 8-2
NO.
ITEM
PIM
1
TOP/BASE
2
BRACKET
3
BASE TRAY
4
PWR CA
5
Note
BATT CA
6
Note
MP
7
FP/BUS
8
BUS CABLE
9
The number of PWR CA and BATT CA are determined by the location of battery installed (inside or outside
Note:
of PIM). As for the BATT CA, it is also required to select the appropriate type. If battery backup is not
needed, these cables are not required.
Page 82
Required Common Equipment for Floor-standing Installation
DESCRIPTION
PIMMD
TOP/BASE
MOUNTING BRACKET
(Optional)
BASE TRAY ASSEM
(Optional)
INTERNAL
BATT
PWR CA-A
EXTERNAL
BATT
BATT CA INT
(for Internal BATT)
BATT CA EXT
(for External BATT)
Refer to the Equipment List
PN-CP15
48-TW-0.7 CONN CA
1 PIM 2 PIM 3 PIM 4 PIM 5 PIM 6 PIM 7 PIM 8 PIM
1
2
3
1
1
1
0
0
0
1
1
1
0
(1)
(1)
0
(1)
(2)
(1)
(2)
(3)
(1)
(1)
(1)
1
1
1
0
0
1
0
1
2
Chapter 8 System Capacity
QTY
4
5
6
7
1
2
2
2
1
1
1
1
1
2
2
2
(2)
(2)
(3)
(3)
(3)
(3)
(4)
(5)
(4)
(5)
(6)
(7)
(1)
(2)
(2)
(2)
1
1
1
1
1
2
2
3
3
4
5
6
NEAX 2000 IPS Configuration Guide
NDA-24347, Issue 1
8
2
2
2
(4)
(6)
(8)
(2)
1
3
7