NOTE 3: When the source clock signal is supplied via the line between the Main Site and the
Remote Site, set the SW1-1 and SW1-2 according to the following table. In this case,
DAIA cards (DAIA0, DAIA1) must be mounted in PIM 0.
CONDITIONS
One DAIA card is
provided.
Two or three DAIA
cards are pro-
vided.
2
NEAX2000 IVS
Installation Procedure Manual
ND-70928 (E), Issue 3.0
CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
DAIA0
DAIA1
SW
SW
SW
SW
1-1
1-2
1-1
1-2
ON
OFF
–
ON
OFF
OFF
ON
· · · ·
SW
SW
SW
1-1
1-2
1-1
–
–
–
–
OFF
OFF
OFF
DAIA5
REMARKS
SW
1-2
–
The clock signal is sent
to PLO0 of MP card via
Supply Route 0
(DAIA0).
OFF
The clock signal supply
route is automatically
changed to Route 1
(DAIA1) if a
transmission line failure
occurs on Supply Route
0.
PN-DAIA-A (DAI)
Page 313
Need help?
Do you have a question about the NEAX2000 IVS2 and is the answer not in the manual?