Installation Of Main Equipment; Floor Standing Installation - NEC NEAX 2000 IPS Installation Manual

Internet protocol server installation procedure manual
Hide thumbs Also See for NEAX 2000 IPS:
Table of Contents

Advertisement

INSTALLATION OF MAIN EQUIPMENT

Floor Standing Installation

Start
Checkup
before installation
Marking
Leveling
Drilling
Detaching Front Cover
A
• Check the site for installing the PBX with the work drawing to verify that the
required floor space is ensured and that service entrances and ducts for trunk/
extension cables, power cables and bus cables have been properly worked at
correct positions. See
Page
84,
Page 85
• Mark positions for installation of the PBX main equipment.
For Fixed Equipment, detach the BASE PLATE from the BASE. See
Marking for BASE
PLATE".
For Stationary Equipment, see
Page 86
NOTE:
Measure the level of the floor surface before installing the PBX main
equipment.
• Check the level of the floor. If necessary, adjust the level by inserting spacers
beneath the equipment.
• First open necessary number of preliminary prepared holes using the drill bit
for small-diameter holes, then use the finishing drill bit for finishing drill holes.
See "Drilling".
• Detach the front cover of each Module. See
Page 88
"Floor Space"
and
"Cable Hole
Page 86
"Floor Marking for BASE
Page 87
– 82 –
CHAPTER 2 INSTALLATION

INSTALLATION OF MAIN EQUIPMENT

Location".
TRAY".
"Detaching FRONT
COVER".
Continued on next page
NWA-008841-001 Rev.5.0
"Floor
90ch2001.fm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents