CHAPTER 2 INSTALLATION
Floor Standing Installation
• Placing PIM on BASE TRAY for Stationary Equipment
Place the PIM and the BASE on the BASE TRAY.
Figure 2-15 Placing PIM on BASE TRAY
BASE TRAY
2
NEAX2000 IVS
Installation Procedure Manual
Page 74
ND-70928 (E), Issue 3.0
Need help?
Do you have a question about the NEAX2000 IVS2 and is the answer not in the manual?