NEC NEAX2000 IVS2 Installation Manual page 134

Integrated voice server
Hide thumbs Also See for NEAX2000 IVS2:
Table of Contents

Advertisement

3. Battery Replacement Table and Battery Warnings
The label which shows battery replacement table and battery warnings is attached to the
reverse side of Front Cover for PIM and BATTM.
During the battery installation process, the warning statements must be observed. When
replacing batteries, the battery replacement table should be observed to increase battery
life and insure safe operation.
PIM/BATTM
BATTERY REPLACEMENT TABLE
INSTALLATION DATE:
AMBIENT
5 ~ 35°C
TEMPERATURE
(AVERAGE 25°C)
REPLACEMENT
3 YEARS
INTERVAL
o ELECTROLYTE LEAKAGE OR OTHER HAZARDS
MAY RESULT IF THE BATTERY IS NOT REPLACED
IN
ACCORDANCE
INTERVALS.
2
NEAX2000 IVS
Installation Procedure Manual
ND-70928 (E), Issue 3.0
CAUTION
0 ~ 50°C
0 ~ 50°C
(AVERAGE 25°C)
(AVERAGE 40°C)
2 YEARS
1 YEAR
WITH
THE
SPECIFIED
CHAPTER 2 INSTALLATION
LABEL
FRONT COVER
TO PREVENT INJURY AND SKIN BURN,
CAUTION
PAY ATTENTION TO THE FOLLOWING.
o DO NOT STRIKE A MATCH OR CAUSE A SPARK IN
VICINITY OF BATTERY.
o PLACE THE EQUIPMENT WELL VENTILATED
AREA.
o DO NOT SHORT.
o REPLACE BATTERY ONLY AFTER BATTERY
GASES HAVE BEEN DISPERSED.
Battery Connection
Page 105

Advertisement

Table of Contents
loading

Table of Contents