CHAPTER 2 INSTALLATION
Procedure
PROCEDURE
This flowchart explains the procedures for installing the PBX system. Follow the procedures in
Figure
2-2.
Page 54
Figure 2-2 Procedure Flowchart (1 of 2)
UNPACKING
WIRING AC CABLE
TERMINALS
INSTALLATION
MAIN EQUIPMENT
POWER CABLE
CONNECTION
SUPPLY VOLTAGE CHECK
HEAT RUN TEST
BATTERY
CONNECTION
CABLE RUNNING
TERMINATION OF
CABLES ON MDF
INSTALLATION
PERIPHERAL EQUIPMENT
SWITCH SETTINGS
CIRCUIT CARDS
START
TO
OF
AND
TO MDF
OF
REFER TO
OF
A
NEAX2000 IVS
Chapter
3.
2
Installation Procedure Manual
ND-70928 (E), Issue 3.0