HindlePower ATevo Series Operations page 152

Float battery charger phase input–group ii (30-100 adc output)
Table of Contents

Advertisement

HindlePower Inc
A user can also initiate, on demand, a discovery poll on the Primary ATevo as follows:
MENU > SYSTEM SETTINGS > discover new hardware
• As seen above, once load sharing has become active, Secondary ATevos will show '(S)'
after the charger mode. In similar manner, the Primary ATevo will show '(P)' with the load-
share indicator.
• Secondary ATevos display the same charger mode as the Primary controlling them.
15.4.1.
15.4.1. Requirements to Maintain
Requirements to Maintain
Forced Load Sharing
Forced Load Sharing
Several events can cause ATevos to break from Forced Load Sharing and resume independent
output control:
• Communication failure between ATevos
• An ATevo is shut down
• An ATevo reports that it is not ready – which may be because of:
◦ ac input failure or low ac line
◦ open DC Output Circuit Breaker (CB2)
◦ HLD or HVDC present
When the issue is corrected the ATevos resume load sharing and again display the load-share
indicator next to charger mode.
Copyright HindlePower Inc. 2021
ATevo Operations–Single Phase Input–Group II (30-100 Adc Output) - 1_en
Last modified: 3 March 2021
Page 150 of 171

Advertisement

Table of Contents
loading

Table of Contents