HindlePower ATevo Series Operations page 148

Float battery charger phase input–group ii (30-100 adc output)
Table of Contents

Advertisement

HindlePower Inc
15.2.
15.2. Forced Load Sharing
Forced Load Sharing
Configuration
Configuration
Factory-Installed Forced Load Sharing
Factory-Installed Forced Load Sharing
If the ATevo is ordered with the forced load sharing feature, the hardware and software
configuration will be completed at the factory. The forced load sharing Serial Communications
Adapters (A13) and software will be verified during production test. The signal interconnection
cable will be supplied in a bagged kit, to be connected to the ATevos in the field after
installation.
Installing Forced Load Sharing in the Field
Installing Forced Load Sharing in the Field
If forced load sharing is added to the ATevo in the field, the following hardware and software
configurations will be required.
1. Install Serial Communications Adapter (A13) according to instructions in the
supplementary ATevo Communications Manual (JA0102-54).
2. Configure jumpers on the Serial Communications Adapter (A13) to operate in 2-WIRE
RS-485 mode.
Copyright HindlePower Inc. 2021
ATevo Operations–Single Phase Input–Group II (30-100 Adc Output) - 1_en
Last modified: 3 March 2021
Page 146 of 171