7.3

Saving settings to an operator panel

You can transfer the inverter settings to the Operator Panel BOP‑2 or vice versa, the data from
the BOP‑2 to the inverter.
Precondition
The inverter power supply has been switched on.
Inverter → BOP-2
Procedure
You have backed up the settings to the BOP-2.
BOP-2 → inverter
Procedure
4. Switch off the inverter power supply.
Converter with the CU250S-2 Control Units
Operating Instructions, 04/2018, FW V4.7 SP10, A5E31759476B AG
1. In the "OPTIONS" menu, select "TO BOP".
2. Start data transfer with OK.
3. Wait until the inverter has backed up the settings to the BOP‑2.
1. In the "OPTIONS" menu, select "FROM BOP".
2. Start data transfer with OK.
3. Wait until the inverter has written the settings to the memory card.