Siemens SINAMICS G120 Operating Instructions Manual page 284

Low voltage inverters built-in units with cu250s-2 control units and encoder evaluation
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Advanced commissioning
6.19 Setpoint calculation
Preconditions
● You have commissioned the communication between the inverter and the control system.
● Free telegram 999 has been set in the inverter and in your higher-level control system.
● The control sends the scaling value to the inverter in PZD 3.
Procedure
1. Set p1138 = 2050[2].
This means that you have interconnected the scaling factor for the ramp-up time with PZD
receive word 3.
2. Set p1139 = 2050[2].
This means that you have interconnected the scaling factor for the ramp-down time with
PZD receive word 3.
The inverter receives the value for scaling the ramp-up and ramp-down times via PZD receive
word 3.
Further information is provided on the Internet:
282
Extending the telegram (Page 203)
FAQ (https://support.industry.siemens.com/cs/ww/en/view/82604741)
Converter with the CU250S-2 Control Units
Operating Instructions, 04/2018, FW V4.7 SP10, A5E31759476B AG

Advertisement

Table of Contents
loading

Table of Contents