Quantum Data 802BT User Manual page 81

Video test generator
Hide thumbs Also See for 802BT:
Table of Contents

Advertisement

802BT/802R Video Test Generator User Guide
The following table describe the default DCS priority scheme for horizontal sync.
OUTG
SSST
0
Do not care
1
Do not care
Do not care
8 (DPMS – OFF)
1
9 (DPMS – SUS-
PEND)
1
10 (DPMS –
STANDBY)
1
1, 3, 5, 7, or 11
1
2, 6, or 11 (DCS)
The following table describe the default DCS priority scheme for vertical sync.
OUTG
SSST
0
Do not care
1
Do not care
Do not care
8 (DPMS – OFF)
1
9 (DPMS – SUS-
PEND)
1
10 (DPMS –
STANDBY)
1
1, 3, 5, 7, or 11
1
2, 6, or 11 (DCS)
To enable the legacy DCS priority scheme:
1. Turn off the generator.
2. Hold down the Step and DCS keys while starting the generator.
The generator will remain in this mode through subsequent power cycles until the
generator is re-initialized or reset with the "No special modes" command (hold down
ACS+DCS+DSS while starting the generator).
HSPG
HS Output
Do not care
No signal
0
No signal
Do not care
No signal
Do not care
Horizontal Sync
Do not care
No signal
1
Horizontal Sync
1
Composite Sync
VSPG
VS Output
Do not care
No signal
0
No signal
Do not care
No signal
Do not care
No signal
Do not care
vertical Sync
1
vertical Sync
1
Composite Sync
HS Polarity
Do not care
Do not care
Do not care
HSPP
Do not care
HSPP
CSPP
VS Polarity
Do not care
Do not care
Do not care
Do not care
VSPP
VSPP
CSPP
71

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

802r

Table of Contents