Required Tools; Table 15: Required Tools - Oracle FS1-2 Installation Manual

Flash storage system
Hide thumbs Also See for FS1-2:
Table of Contents

Advertisement

you will need a total distance of at least 15 feet or 4.5 meters for safe
maneuvering.
Note: The fork lift must only be used on the specified side of the shipping pallet
to avoid causing damage to the system.
You can unpack the contents of the palet following the rack unpacking
instructions that is located in the packaging. Unpack the cartons carefully and
dispose the packaging materials. Remove the system record, packing list, and
other instructional documents from the cartons and keep them aside for
reference.
The following tools are included in the shipping pallet:
13 mm and 17 mm combination open end wrench
19 mm open end wrench
Note: Make sure that you verify all the components against the packing list that
is pasted on the container.
Tip: Check the packing materials to verify that you have retrieved all the small
parts before recycling.
CAUTION: The maximum weight of the racked storage system is 1970 lb (894 kg).
Three people are required to off-load the rack: two at the front and one at the
back.
Related Links
Racked Systems
Electrostatic Discharge Precautions
Warnings and Cautions

Required Tools

Required Tools
Before starting the installation of an Oracle Flash Storage System, be sure you
have the required equipment and tools available.

Table 15: Required tools

Tool
Number 1 and Number 2
Phillips-head screwdrivers
Offset box wrench, 13/32
inches
Torx
T20 screwdriver
®
Oracle FS Systems: Installation Overview
Purpose
Remove and secure Oracle
Flash Storage System
hardware components.
Work with adjustable
mounting rail assemblies.
Attach rail assemblies and
secure hardware
components to the rails.
Illustration
31