Customer-Supplied Equipment And Tools; Table 5 Required Tools - Oracle Pillar Axiom 600 Hardware Installation Manual

Oracle pillar axiom 600 hardware installation guide
Table of Contents

Advertisement

Chapter 1 Before You Begin

Customer-Supplied Equipment and Tools

Before starting the installation of a Pillar Axiom 600 system, be sure you have the
needed equipment and tools installed or available.

Table 5 Required tools

Tool
1/4 inches (7 millimeters)
flat-tip screwdriver
Adjustable wrench, 6
inches (15 centimeters)
#1 and #2 Phillips-head
screwdrivers
Socket wrench with a 1/2-
inches (13millimeters)
socket
Offset box wrench, 13/32
inches (10 millimeters)
Torx® T20 screwdriver
Torx® T30 screwdriver
Wire cutters
Note: These tools are not included with the Pillar Axiom 600 system.
To install a Pillar Axiom 600 system you need to have the following equipment
and supplies available or installed before you start the installation of the system:
Customer-Supplied Equipment and Tools
Purpose
Adjust leveling feet.
Adjust leveling feet.
Remove and secure Pillar
Axiom 600 hardware
components.
Connect two racks.
Work with adjustable
mounting rail assemblies.
Attach rail assemblies to
the vertical channels and
secure hardware
components to the rails.
Connect two racks.
Cut tie wraps.
Illustration
23

Advertisement

Table of Contents
loading

Table of Contents