Maintenance - ABB M2000 Product Manual

Articulated robot
Hide thumbs Also See for M2000:
Table of Contents

Advertisement

3 Maintenance

3.1. Introduction
Structure of this chapter
This chapter details all maintenance activities recommended for the robot and any external
units of the robot.
It is based on the maintenance schedule, located in the beginning of the chapter. The schedule
contains information about required maintenance activities including periodicity and refers to
procedures for the activities.
Each procedure contains all information required to perform the activity, e.g. required tools
and materials.
The procedures are gathered in different sections, divided according to the maintenance
activity.
Safety information
Before any service work is commenced, it is extremely important that all safety information
is observed!
There are general safety aspects that must be read through, as well as more specific safety
information that describe danger and safety risks when performing the procedures. Make sure
to read through the chapter
3HAC023297-001 Revision: A
Safety
on page 13.
3 Maintenance
3.1. Introduction
63

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M2000aM2004

Table of Contents