ABB M2000 Product Manual page 172

Articulated robot
Hide thumbs Also See for M2000:
Table of Contents

Advertisement

5 Calibration information
5.5. Updating revolution counters
Step
Storing the revolution counter setting with the FlexPendant
This procedure details the second step when updating the revolution counter; storing the
revolution counter setting with the FlexPendant (RobotWare 5.0).
Step
170
Action
6.
Press OK again to confirm and start the update.
CANCEL returns to the Revolution Counter Update window.
7.
At this point, it is recommended that the revolution counter
values are saved to a diskette.
8.
-
Caution!
If a revolution counter is incorrectly updated, it will cause
incorrect robot positioning, which in turn may cause damage or
injury!
Check the calibration position very carefully after each update.
How to perform the check is detailed in section
calibration position
on page 172.
Action
1.
On the ABB menu, tap Calibration.
All mechanical units connected to the system are shown along with their calibration
status.
2.
Tap the mechanical unit in question.
A screen is displayed: tap Rev. Counters.
en0400000771
Note
Not required.
Checking the
3HAC023297-001 Revision: A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M2000aM2004

Table of Contents