ABB M2000 Product Manual page 85

Articulated robot
Hide thumbs Also See for M2000:
Table of Contents

Advertisement

Step
3HAC023297-001 Revision: A
Action
3.
Cable layout in the lower arm.
4.2.1. Replacement of cable harness
Note/Illustration
xx0200000449
A: Cable ties
B: Pressurized air hose
C: Power cables, axes 4, 5 and 6
D: Customer cables, signal
E: Signal cables, axes 4, 5 and 6
F: Signal cable, axis 3
G: Connectors R3.MP3 and R3.FB3
4 Repair
83

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M2000aM2004

Table of Contents