4 Repair
4.2.2. Replacement of complete upper arm
DANGER!
When performing the first test run after a service activity (repair, installation or maintenance,
it is vital that:
90
•
all the service tools and other foreign objects are removed from the manipulator!
•
all normal safety equipment is installed properly, e.g. TPU enabling device.
•
all personnel are standing at a safe distance from the manipulator, i.e. out of its reach
behind any safety fences, etc.
•
special attention is paid to the function of the part previously serviced.
3HAC023297-001 Revision: A