Prepping The Upper Tower Mounts - SeeMeCNC Rostock MAX v2 Assembly Manual

Hide thumbs Also See for Rostock MAX v2:
Table of Contents

Advertisement

Prepping the Upper Tower Mounts

Before you can install the upper tower mounts, three tower depth stop screws need to be
installed as shown below.
Fig. 7-2: Upper tower mounts (preliminary).
These screws perform the same function as the ones previously installed in the lower tower
mounts. This helps guarantee that the top section will be at the correct height on all three towers.
Note that your kit will ship with a part that looks very
much like the one to the right. This was a very recent design
change and is not reflected in the manual. It is strictly a cosmetic
change.
Rostock MAX v2 Assembly Guide
98

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Rostock MAX v2 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents