While completing this section you'll notice a discrepancy between the photos and the text with
regard to the idler bearing installation. Originally, I installed the idler bearings into the top plate before
mounting it to the towers. Doing that first increases the difficulty in getting the wiring threaded
through the openings in the top plate, so I'm going to have you mount the top plate and THEN install
the idler bearings. My apologies for any confusion this creates!
Fig. 9-2:Top Plate ready for installation.
Installing the top plate is pretty easy, it just takes patience. You'll want to orient the top so that
the Z tower is farthest away and the X and Y towers are closest to you. See Ill. 9-1.
Carefully thread the wiring in each
tower through the tower mounts and
toward the center of the top plate as
indicated by the red arrows in Ill. 9-1.
Rostock MAX v2 Assembly Guide
121
Need help?
Do you have a question about the Rostock MAX v2 and is the answer not in the manual?