Tools Required for Installation and
Service
The following tools are required to install and service the system:
Screwdriver, Phillips No. 1
■
Screwdriver, Phillips No. 2
■
Nut driver, 3/16ths inch
■
Electrostatic discharge (ESD) mat, Sun part number 250-1088, or equivalent
■
Grounding wrist or foot strap
■
The latter two items help protect the server against damage due to electrostatic
discharge. For more information, see
page
28
Sun Fire V890 Server Service Manual • October 2005
26.
"How to Avoid Electrostatic Discharge" on