Reference for Installation and Service:
Tools Required
The following tools are required to install and service the system:
Screwdriver, Phillips #1
Screwdriver, Phillips #2
Screwdriver, long flat-blade #2
ESD mat, Sun PN 250-1088, or equivalent
Grounding wrist or foot strap
The latter two items help protect the server against damage due to electrostatic
discharge. For more information, see "How to Avoid Electrostatic Discharge" on
page 35.
Chapter 3
Preparing to Install or Replace Parts
37