What Next; How To Install The Power Distribution Board; Before You Begin - Sun Microsystems Fire V890 Service Manual

Hide thumbs Also See for Fire V890:
Table of Contents

Advertisement

b. I/O board remote sense cable (P38) from the power distribution board at
connector P38/J10(Sense/5Vstby)
7. Remove the power distribution board from the system.
8. Place the board on an antistatic mat.

What Next

To replace the power distribution board, complete this task:
"How to Install the Power Distribution Board" on page 204
How to Install the Power Distribution
Board

Before You Begin

Complete this task:
"How to Avoid Electrostatic Discharge" on page 26
204
Sun Fire V890 Server Service Manual • October 2005

Advertisement

Table of Contents
loading

Table of Contents